Stowen Decommissioning excavator-mounted cutting and lifting tool severing a wellhead casing at an onshore well site

Excavate · Cut · Cap

Cut safer. Finish faster.

Our excavator-mounted tool grips the casing above the cut, severs it clean, and lifts the section clear in a single motion — then we cap the casing and hand the site back. No separate crane. No crew in the cut zone.

1
Tool, two jobs — cut & lift
0
Crew standing at the cut
Nationwide
US coverage from our Houston HQ

The Problem

Wellhead removal hasn’t changed in decades

Cutting torches, standalone lifting rigs, and crew working directly over the wellbore — the traditional method turns a routine step in plug & abandonment into one of the riskiest parts of the job.

Read the full breakdown

Excavated wellbore casing ahead of removal

How It Works

Excavate. Cut. Cap.

Everything we do happens at the wellhead, with one excavator and one purpose-built tool.

01

Excavate

We dig out around the wellhead to expose the casing, using the same excavator that carries the cutting tool.

02

Cut & lift

The tool clamps the casing, a hydraulic saw cuts it clean with no torch and no open flame, and the same jaws lift the section clear.

03

Cap

The remaining casing is capped and the location is handed back, with the redundant wellhead gone.

Full process & specs

Close-up of the Stowen Decommissioning cutting and lifting tool jaws

Safety

Built around one rule: nobody stands at the cut

Every step — clamp, cut, lift — happens from inside the excavator cab. The crew that used to stand over the wellbore now watches from a safe distance.

  • No hot work

    The hydraulic saw blade replaces cutting torches, removing the ignition source entirely.

  • One operator, full control

    Clamp, cut, and lift are controlled from a single cab — no ground crew positioned under load.

See the full safety case

Service

Wellhead decommissioning, mobilized fast

Run from our head office in Houston, Texas, we mobilize to onshore sites across the United States — with crews already working in Texas and California.

Site assessment

We review casing size, well condition, and site access before mobilizing equipment.

Mobilization

The tool mounts to your excavator or ours — minimal extra equipment on location.

Excavate, cut, cap

Wellhead removed, casing capped and the location handed back to you.

View service details

Coverage

Working across the US

Our head office is in Houston, Texas, and we mobilize to onshore sites anywhere in the United States. We already have crews working in Texas and California, and Canada is next.

Head office

Houston, Texas

Our US leadership team, warehousing and tooling maintenance, all at our Jackrabbit Road facility.

Active now

Texas & California

Wellhead removal work currently underway in both states.

Available

Nationwide

Onshore sites across the US, from single wells to multi-well programs.

Planned

Canada

Next on our roadmap. Get in touch to discuss upcoming programs.

About

Part of the Stowen Group

Stowen Decommissioning is the onshore wellhead specialist within the Stowen Group, built to bring a purpose-engineered approach to excavating, cutting and capping redundant wellheads — a job that's long relied on general-purpose equipment.

More about Stowen

Aerial view of an onshore drilling and production site

Latest news

Expanding our US presence

Stowen's new facility on Jackrabbit Road, Houston, Texas
Facility

New US facility opens in Houston, Texas

Our new site on Jackrabbit Road gives our US wellhead decommissioning work dedicated warehousing and tooling maintenance, and is home to our US leadership team.

Ready to clear your site faster?

Request a Briefing