Service
Onshore decommissioning, mobilized fast
From first call to a cleared site — a straightforward process built around one piece of equipment.
The engagement
How a project runs
Site assessment
We review well records, casing size, and site access — by phone, email, or an on-site visit — to confirm the job scope before mobilizing.
Scheduling & mobilization
The cutting tool ships to site and mounts to an excavator already on location, or one we bring with us.
Cut, lift, clear
The wellhead is removed in a single operation and the severed section is set down for transport or disposal per your site plan.
Site hand-back
The location is left ready for the next stage of plug & abandonment — cellar work, surface reclamation, or final inspection.
Coverage
Where we operate
Currently based in and around the Permian Basin, with mobilization available to onshore sites across Texas. Expanding coverage as fleet capacity grows.
Permian Basin
Home base of operations — fastest mobilization and shortest lead times.
Texas onshore
Available statewide for single wells and multi-well pad programs.
Beyond Texas
Available on request for larger programs — get in touch to discuss.
Fleet
One attachment, scaled to the job
The cutting and lifting tool is sized to work with mid-to-large excavators already common in the field, minimizing the equipment you need to bring on site.